The quickest way to edit a scheduled report in Link Reporting is to:
- Open the report type
- Load, select the report you want to edit and Run
- Make any changes to the groupings, filters, columns and sort and Schedule
- Save the report with a different name and edit the recipients
- Delete the old scheduled report under Load
Comments
0 comments
Please sign in to leave a comment.